Skip to content

DEPENDENCY UPGRADE: minor upgrades — 5 packages (minor: 1 · patch: 4) #3132

DEPENDENCY UPGRADE: minor upgrades — 5 packages (minor: 1 · patch: 4)

DEPENDENCY UPGRADE: minor upgrades — 5 packages (minor: 1 · patch: 4) #3132

Triggered via pull request March 9, 2026 14:41
Status Failure
Total duration 9m 5s
Artifacts

build.yml

on: pull_request
Matrix: unit-test
Fit to window
Zoom out
Zoom in

Annotations

7 errors
unit-test (3.8)
Process completed with exit code 1.
unit-test (3.9)
The strategy configuration was canceled because "unit-test._3_8" failed
unit-test (3.9)
The operation was canceled.
unit-test (3.10)
The strategy configuration was canceled because "unit-test._3_8" failed
unit-test (3.10)
The operation was canceled.
unit-test (3.11)
The strategy configuration was canceled because "unit-test._3_8" failed
unit-test (3.11)
The operation was canceled.