Skip to content

wip

wip #4

Triggered via push April 20, 2025 08:57
Status Failure
Total duration 50s
Artifacts

run-tests.yml

on: push
Matrix: tests
Fit to window
Zoom out
Zoom in

Annotations

32 errors
P8.1 - L10.* - prefer-lowest - ubuntu-latest
Process completed with exit code 2.
P8.1 - L10.* - prefer-lowest - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires javaabu/translatable ^1.1 -> satisfiable by javaabu/translatable[v1.1.0, ..., v1.1.14]. - javaabu/translatable[v1.1.0, ..., v1.1.14] require php ^8.2 -> your php version (8.1.32) does not satisfy that requirement.
P8.4 - L12.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.1 - L10.* - prefer-stable - ubuntu-latest
Process completed with exit code 2.
P8.1 - L10.* - prefer-stable - ubuntu-latest
Your requirements could not be resolved to an installable set of packages. Problem 1 - Root composer.json requires javaabu/translatable ^1.1 -> satisfiable by javaabu/translatable[v1.1.0, ..., v1.1.14]. - javaabu/translatable[v1.1.0, ..., v1.1.14] require php ^8.2 -> your php version (8.1.32) does not satisfy that requirement.
P8.1 - L10.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.4 - L10.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.2 - L12.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.3 - L9.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.2 - L10.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.2 - L11.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.2 - L9.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.3 - L11.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.4 - L11.* - prefer-stable - ubuntu-latest
A task was canceled.
P8.4 - L11.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.1 - L9.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.1 - L9.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.4 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.4 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.1 - L9.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L11.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.3 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.3 - L10.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.4 - L10.* - prefer-stable - ubuntu-latest
The operation was canceled.
P8.4 - L10.* - prefer-stable - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.3 - L9.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.3 - L9.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.2 - L9.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.2 - L9.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed
P8.4 - L9.* - prefer-lowest - ubuntu-latest
The operation was canceled.
P8.4 - L9.* - prefer-lowest - ubuntu-latest
The strategy configuration was canceled because "tests.ubuntu-latest_8_1_10___pr" failed