feat(runtime): migrate docker-git to bun and gridland #561
check.yml
on: pull_request
Build
56s
Types
1m 5s
Lint
2m 8s
Test
1m 11s
Lint Effect-TS
49s
E2E (Local package CLI)
52s
E2E (OpenCode)
2m 56s
E2E (Clone cache)
2m 55s
E2E (Login context)
2m 56s
E2E (Runtime volumes + SSH)
2m 56s
Annotations
11 errors
|
Test
Process completed with exit code 1.
|
|
Lint
Process completed with exit code 1.
|
|
E2E (Clone cache)
Canceling since a higher priority waiting request for Check-refs/pull/216/merge exists
|
|
E2E (Clone cache)
The operation was canceled.
|
|
E2E (Login context)
Canceling since a higher priority waiting request for Check-refs/pull/216/merge exists
|
|
E2E (Login context)
The operation was canceled.
|
|
E2E (OpenCode)
Canceling since a higher priority waiting request for Check-refs/pull/216/merge exists
|
|
E2E (Runtime volumes + SSH)
Canceling since a higher priority waiting request for Check-refs/pull/216/merge exists
|
|
E2E (OpenCode)
The operation was canceled.
|
|
E2E (Runtime volumes + SSH)
The operation was canceled.
|
|
Check
Canceling since a higher priority waiting request for Check-refs/pull/216/merge exists
|