Skip to content

Repair design in Timing Driven GPL #10073

@rafaelmoresco

Description

@rafaelmoresco

The worst paths seen during GPL Timing Driven iterations are not the actual worst paths of the flow. This can be seen by running a repair_timing after the placement stage in ORFS. With the intention of bridging the gap between worst GPL and GRT worst paths, the following are proposed:

  • Add repair timing in addition of repair design to TD GPL
  • Test the best configurations for the repair timing
  • Try a variation with only repair timing instead of repair design

Metadata

Metadata

Assignees

Labels

gplGlobal Placement

Type

Projects

No projects

Milestone

No milestone

Relationships

None yet

Development

No branches or pull requests

Issue actions