Skip to content

Update V2 pipelines to create AffectedPackageV2 #5142

Update V2 pipelines to create AffectedPackageV2

Update V2 pipelines to create AffectedPackageV2 #5142

Triggered via push July 28, 2025 18:45
Status Failure
Total duration 3m 26s
Artifacts

main.yml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors
build (3.10)
Process completed with exit code 2.
build (3.11)
The operation was canceled.
build (3.11)
The strategy configuration was canceled because "build._3_10" failed
build (3.9)
The operation was canceled.
build (3.9)
The strategy configuration was canceled because "build._3_10" failed