Skip to content

ci: enable ci to run for pull requests from all branches#2749

Open
pratap0007 wants to merge 1 commit intotektoncd:mainfrom
pratap0007:fix-ci
Open

ci: enable ci to run for pull requests from all branches#2749
pratap0007 wants to merge 1 commit intotektoncd:mainfrom
pratap0007:fix-ci

Conversation

@pratap0007
Copy link
Contributor

Changes

Submitter Checklist

These are the criteria that every PR should meet, please check them off as you
review them:

  • Includes tests (if functionality changed/added)
  • Run the code checkers with make check
  • Regenerate the manpages, docs and go formatting with make generated
  • Commit messages follow commit message best practices

See the contribution guide
for more details.

Release Notes

Signed-off-by: Shiv Verma <shverma@redhat.com>
@tekton-robot tekton-robot added the release-note Denotes a PR that will be considered when it comes time to generate release notes. label Feb 26, 2026
@tekton-robot
Copy link
Contributor

[APPROVALNOTIFIER] This PR is NOT APPROVED

This pull-request has been approved by:
To complete the pull request process, please ask for approval from pratap0007 after the PR has been reviewed.

The full list of commands accepted by this bot can be found here.

Details Needs approval from an approver in each of these files:

Approvers can indicate their approval by writing /approve in a comment
Approvers can cancel approval by writing /approve cancel in a comment

@tekton-robot tekton-robot added the size/XS Denotes a PR that changes 0-9 lines, ignoring generated files. label Feb 26, 2026
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

release-note Denotes a PR that will be considered when it comes time to generate release notes. size/XS Denotes a PR that changes 0-9 lines, ignoring generated files.

Projects

None yet

Development

Successfully merging this pull request may close these issues.

2 participants